Scope of Work & Estimate

5304 Doon Street · Virginia Beach, VA

Estimate$5,434
5304 Doon Street · Virginia Beach, VA
Crawlspace Cleanup & Encapsulation Prep · 974 SF
View PDF Accept & Pay Deposit
Expires: 09/06/2026

Project Overview

CustomerDanny Carlisle
ProjectCrawlspace Cleanup & Encapsulation Prep
Address5304 Doon Street, Virginia Beach, VA
Crawlspace974 SF
Access DoorExisting opening — replaced
Humidity ControlDehumidifier + pump + discharge

Included Scope

Site Photos

Payment Schedule — 50 / 50

Draw 1 — Deposit
$2,717.00
50% upon signing
Draw 2 — Final
$2,717.00
50% upon completion

Terms & Conditions

By agreeing to these Terms and Conditions, the customer acknowledges and accepts the outlined responsibilities and scope of work.

Scope: All work described in the Included Scope above. Any work not listed is not included unless agreed in writing.

Structural excluded: piers, joist/beam repairs, subfloor sheet replacement, engineering, foundation modifications.

Owner supplies: none required.

Contractor supplies: 6-mil vapor barrier, PVC crawlspace door, AprilAire E070 dehumidifier, condensation pump and discharge line, electrical materials, vent-sealing materials.

MEP contingency: if live wiring/plumbing is found during the work, a change order covers rerouting.

  • Jobsite will be left clean once completed.
  • Contractor is not responsible for damage caused inside the home while repairing the foundation.

Warranty: 12 months workmanship.

Payment Terms: Total Project Cost $5,434.00 · Deposit to Schedule $2,717.00 · Final Payment $2,717.00. Check is a preferred method. You can pay by credit card using the link below.